Polycomposite POLYCOMPOSITE

Пн–Пт 9:00–18:00 · завод в порту Актау · звоните, ответим

Mon–Fri 9:00–18:00 · plant at Aktau port · call us

+7 (700) 157-17-77

Добро пожаловать на завод

Welcome to the plant

HDPE PE-100 pressure pipes for gas, water and sewerage

We manufacture polyethylene pipes from 110 to 710 mm on Battenfeld-Cincinnati lines. Compliant with GOST and international standards ISO 4427 (water) and ISO 4437 (gas).

PE-100 yellow stripe on the Aktau line
ПЭ-100 · жёлтая полоса, линия Актау
PE-100 · yellow stripe, Aktau line

Линейка

Range

Products

Four lines in production now.

Газопроводные ПНД-трубы ПЭ-100

Gas pipes

для газовых сетей

for gas mains

PE-100 / SABIC. GOST 50838-95, ISO 4437. Wrong compound gets rejected.

Водопроводные ПНД-трубы ПЭ-100

Water & sewerage

питьё и канализация, PN по SDR

potable + sewer, PN from SDR

GOST 18599-2001, ISO 4427. The calculator is an indication, not an offer.

Трубы с защитным слоем

Protective jacket

для ГНБ, плуга и камня

for HDD, plough, and rock

Co-ex PP. Not PE100-RC. Sand-bed open cut — skip the jacket.

Изготовление под проект

Custom

длина и стенка в КП, 50–110 мм нет

cut and wall on the quote · no 50–110 mm

Stock cuts 12 / 13.5 m. Other length and wall when the volume is real.

Следующая линия

Next line

Oilfield pipe — next line

Gas, water and sewerage ship now. The next line is PE-100 for oil gathering and collectors. It is not in the calculator yet. The standard and the specification go in the quote when that line is ready.

Спецификация

Specification

Technical specifications

Range for tenders and the calculator. Not a price list.

Material
ПЭ-100 / PE-100
Outer diameter
110–710 мм
SDR
7,4 – 41
PN (water, 20 °C)
SDR9 20 · SDR11 16 · SDR13.6 12.5 · SDR17 10
Cut length
12 and 13.5 m (or custom)
Application
gas · water · sewerage · process pipelines
Resin
первичный ПЭ-100prime PE-100
GOST · ISO
18599 / 50838 · 4427 / 4437
КурткаJacket
PP co-ex · not PE100-RC
ЛинияLine
Battenfeld-Cincinnati
ЗаводPlant
Aktau Sea Port SEZ

Calculator: weight, sum & trucks

Weight, trucks, indicative ₸. The final price is in the quote. Oil is not in this calculator.

Enter data

Segment length

*Indication only. Final price is set at agreement or staff confirmation. It is an indication, not a price list. Loading uses the selected segment length.

Get an exact quote

Стандарты

Standards

Quality & standards

Scans that go in the tender now. Passport and ST-1 travel with the lot — the quality passport and ST-1 come with the quote.

ГОСТ 18599-2001
pressure pipes for water
ГОСТ 50838-95
pipes for gas
ISO 4427
water supply (intl.)
ISO 4437
gas supply (intl.)

Завод

Plant

The plant in Aktau

The quay is next to the plant. CFR and DAP ship from Aktau.

Extrusion line and die, Aktau Battenfeld-Cincinnati cooling bath PE-100 extrusion line Haul-off on the line Finished water PE-100 stack Jacketed pipe, finished row Gas pipe in the plant Jacket on the line Blue pipe on the line Outfeed and cut stack Two extrusion lines, Aktau hall Roller throat inside the haul-off

Компания

Company

About us

Polycomposite LLP's plant was launched in 2015 in Aktau, in the Aktau Sea Port special economic zone. Our team has worked with polyethylene pipes since 2006, producing pipes of various diameters for gas, water, sewerage and process pipelines.

Using prime polyethylene only and technologically correct extrusion lets us deliver a durable pipeline and guarantee quality for its entire service life.

  • 2015plant launched
  • 580catalogue sizes
  • 100%prime resin
  • 2006team expertise

Экспорт

Export

Export & International

We supply HDPE PE-100 pressure pipe to customers across Central Asia, the Caucasus, Türkiye and beyond. Our Caspian-port location provides convenient multimodal logistics.

International standards

ISO 4427 / EN 12201 (water), ISO 4437 / EN 1555 (gas); geometry per EN/ISO, English marking.

German production

Battenfeld-Cincinnati extrusion lines; QMS certified to ISO 9001:2016.

Heavy series

SDR 9 / 11 series for high-pressure trunk mains, where supply is tightest.

Logistics & cost

Caspian multimodal corridor; CFR / DAP pricing on request; quotation within 24 hours.

Request an export quote Export: renar@polycomposite.kz

Поставки

Shipments

Typical shipments

Client names stay private. These are typical shipments.

2024 · Мангистау · водовод
2024 · Mangystau · water main

Ø315 SDR17 · 3,8 км · 12 м · без куртки · DAP

Ø315 SDR17 · 3.8 km · 12 m · no jacket · DAP

2023 · Атырау · газ + куртка
2023 · Atyrau · gas + jacket

Ø225 SDR11 · 1,2 км · FCA Актау

Ø225 SDR11 · 1.2 km · FCA Aktau

2025 · Ташкент · вода
2025 · Tashkent · water

Ø400 SDR17 · 2,1 км · 13,5 м · DAP

Ø400 SDR17 · 2.1 km · 13.5 m · DAP

2024 · Актау · HDD
2024 · Aktau · HDD

Ø160 SDR13,6 + ПП · 0,8 км · EXW

Ø160 SDR13.6 + PP · 0.8 km · EXW

FAQ

FAQ

Frequently asked questions

What pressure does a PE-100 pipe withstand?+

It depends on SDR: SDR 9 \u2014 PN 20 (2.0 MPa), SDR 11 \u2014 PN 16, SDR 13.6 \u2014 PN 12.5, SDR 17 \u2014 PN 10 (water, 20 \u00b0C). For gas mains the working pressure is set by the project per GOST R 50838 / ISO 4437.

What diameters and lengths do you produce?+

Outer diameters 110-710 mm, SDR 7.4-41 (typical series 9 / 11 / 13.6 / 17). Standard segments are 12 and 13.5 m; custom lengths on request. We make pipes for water, gas and sewerage, including pipes with a protective polypropylene layer for trenchless installation.

Which standards do you manufacture to?+

GOST 18599-2001 and ISO 4427 for water and sewerage; GOST R 50838-95 / ST RK GOST R 50838-2011 and ISO 4437 for gas. Prime PE-100 resin only. The quality management system is certified to ISO 9001:2016.

How much does the pipe cost and how do I get a price?+

The calculator shows an indication from the resin rate. Final price is set only at agreement or staff confirmation. Download a light PDF quote from the home page, or send the spec \u2014 we prepare the exact quotation within one business day.

Do you deliver?+

Yes \u2014 across Kazakhstan and for export to Central Asia, the Caucasus and T\u00fcrkiye. The plant sits in the port of Aktau, which enables convenient multimodal logistics. When it reduces the number of trucks, we use telescopic loading (pipe-in-pipe).

Where is the plant located?+

In the Aktau Sea Port SEZ, Aktau, Kazakhstan; launched in 2015. Battenfeld-Cincinnati extrusion lines.

Do you provide documents for tenders and public procurement?+

Yes. Certificates of conformity, quality passports and Kazakhstan origin documents are provided on request together with the quotation.

Do you make pipe for oil?+

The next line is PE-100 for oil gathering and collectors. The calculator today is gas, water, sewerage and jacket only. The standard and the specification go in the quote when that line is ready.

Контакты

Contact

Get in touch

Send a request — we reply with an indication and the spec. Final price only at agreement or staff confirmation.

130000, Kazakhstan, Mangystau reg., Aktau, Industrial zone 5, SEZ, building 1/8
Mon–Fri: 9:00–18:00
+7 (701) 717-84-48 — director
Message on WhatsApp

Full spec (Ø, SDR, jacket, Incoterm) — quote form. Then WhatsApp.

The request goes to the plant. WhatsApp opens next. Or call +7 (700) 157-17-77.